Incoming inspectionMaterial identity, quantity, condition and critical incoming requirements verified before release.
In-process inspectionDefined checks at machining, forming, molding, welding or finishing stages.
Final inspectionDrawing, cosmetic, assembly and packaging requirements verified before shipment.
Release documentationInspection records, certificates and customer-required documents packaged with the lot.
PPAPProduction approval support
PPAP documentation can be structured for programs requiring dimensional results, material records, process controls, samples and formal production approval.
WELD / NDTWeld validation
Dye-penetrant and other NDT routes can be specified where weld integrity requires additional validation beyond visual and dimensional inspection.
COATING / PLATINGFinish validation
Plating and coating thickness, adhesion, appearance and application-specific requirements can be verified using suitable methods including XRF where appropriate.
CALIBRATIONMeasurement discipline
Gauges and inspection devices are managed through defined calibration status, due dates and traceable records so expired equipment is not used for product acceptance.
NCRContainment & non-conformance
Suspect product is identified, segregated and dispositioned through a controlled non-conformance process rather than being allowed to flow unnoticed.
8D / RCACorrective action
Recurring or significant issues can trigger root-cause analysis, 8D-style corrective action, verification of effectiveness and documented closure.